Haven’t posted anything on the basement in a while now, but work has been moving along slowly and may be nearing completion! First the back wall came in place, with the mount for the sink. Then I worked on the tiles inside the shower area.

Back wall with sink Shower tiles detail Shower tiles

The next stage was to put up the rest of the walls. Finally the bathroom is enclosed.

Side view 1 Side view 2 Side view 3

Now we are reaching the final detail stages with tiles on the floor, paint on the walls.

Painted back wall Floor tiles Sink