Tue 11 Apr 2006
Haven’t posted anything on the basement in a while now, but work has been moving along slowly and may be nearing completion! First the back wall came in place, with the mount for the sink. Then I worked on the tiles inside the shower area.
The next stage was to put up the rest of the walls. Finally the bathroom is enclosed.
Now we are reaching the final detail stages with tiles on the floor, paint on the walls.